How To...
Our How To... documents, or Standard Details, have been guiding installers on our solutions for over 20 years. Often, it is these solutions that form the basis for the bespoke specification that we can provide for your structural problem.
Code | How To... | |
---|---|---|
BF01 | Crack Stitching | |
BF02 | Repairing Failed Lintels (Solid Wall) | |
BF03 | Repairing Failed Lintels (Cavity Wall) | |
BF04 | Reconnecting Internal and External Solid Walls | |
BF05 | Reconnecting Internal and External Cavity Walls | |
BF06 | Crack Stitching on a Corner (Solid Wall) | |
BF07 | Crack Stitching on a Corner (Cavity Wall) | |
BF08 | Beaming (Solid Wall) | |
BF09 | Beaming (Cavity Wall) | |
BF10 | Constructing Movement Joints (Solid Wall) | |
BF11 | Constructing Movement Joints (Cavity Wall) | |
BF12 | Repairing a Bay Window | |
BF13 | Repairing Cracks at Junctions Of Walls | |
BF14 | Reinforcing Bowing Walls Around Stairwells | |
BF15 | Repairing Brick Arch Structures (Reinforcing) | |
BF16 | Repairing Brick Arch Structures (Barrel Beam) | |
BF17 | Repairing Brick Arch Structures (Crack Stitching) | |
BF21 | Repairing Brick Quoins (Random Stone Walls) | |
BF22 | Repairing Stone Quoins (Random Stone Walls) | |
BF23 | Crack Stitching on a Corner (Random Stone Walls) | |
BF24 | Repairing Internal Corners in Solid Walls | |
BF25 | Repairing Internal Corner in Cavity Walls | |
BF26 | Installing A Beam (Random Stone Walls) | |
BF27 | Strengthening Lintels (Random Stone Walls) | |
BF28 | Crack Stitching on a Corner (Stone Walls) | |
BF29 | Repair Stone Arch Structure (Crack Stitching) | |
BF30 | Beaming (Solid Cob Wall) | |
BF31 | Repairing Brick Quoins (Solid Cob Wall) | |
BF32 | Repairing Stone Quoins (Solid Cob Wall) | |
BF33 | Repairing Corner Cracks Using Timber Spreaders | |
BF34 | Repairing Corner Cracks Using Pad Stones (Cob Wall | |
BO01 | Fixing Bowing Walls (End Grain) | |
BO02 | Fixing Bowing Walls (Side Grain) | |
BO03 | Repairing Bay Windows | |
BO04 | Fixing Bowing Walls on a Timber Framed Building | |
CF01 | Fixing Delaminating or Separating Masonry | |
CF02 | Reconnecting a Crack in a Solid Wall Junction | |
CF03 | Reconnecting an Internal Wall to an External Wall | |
CF04 | Cross Stitching in Solid Walls | |
CF05 | Repairing Failed Soldier Course Lintels | |
CF06 | Repairing Cracks near the Corners of Solid Walls | |
CF07 | Repairing Cracks near the Corners of Cavity Walls | |
CF08 | Repairing Failed Brick Arch Lintels | |
CF09 | Securing Straight Parapet Walls | |
CF10 | Securing Curved Parapet Walls | |
CF11 | Securing Parapets in Cavity Walls | |
CF12 | Repairing Bay Windows | |
CF13 | Repairing Brick Arch Structures | |
CF14 | Repairing Brick Arch Structures | |
CF15 | Repairing Brick Arch Structure - Brick Replacement | |
CF16 | Repairing Brick Arch Structures (Spandrel Pinning) | |
CF17 | Repairing Brick Faced Stone Walls (Through Face) | |
CF18 | Repairing Brick Faced Stone Walls (Hidden Fix) | |
CF19 | Repairing Stone Faced Stone Walls (Through Face) | |
CF20 | Repairing Stone Faced Stone Walls (Hidden Fix) | |
CF21 | Repairing Brick Quoins on Stone Walls | |
CF22 | Repairing Stone Quoins on Stone Walls | |
CF23 | Repairing Cracks Near Corners (Random Stone Walls) | |
CF24 | Reconnecting Random Stone Walls | |
CF25 | Strengthening Random Stone Walls (Beaming Ties) | |
CF26 | Repairing Stone Arch Structures (Spandrel Pinning) | |
CF27 | Reconnecting Random Stone Walls (Barrel Pinning) | |
FF01 | Securing Timbers to a Wall Plate | |
FF02 | Securing Angle Timbers | |
FF03 | Securing an Upright Post to a Wall Plate | |
FF04 | Securing a Wall Plate to an Upright Post | |
FF05 | Strengthening Timber Truss Joints | |
FF06 | Strengthening Timber Truss Joints | |
FF07 | Securing a Wall Plate to the Top of a Wall | |
FF08 | Fixing Vertical Battens to Insulation Clad Masonry | |
FF09 | Fixing Vertical Battens to Insulation Clad Timber | |
HP01 | Repairing Brick Retaining Walls | |
HP02 | Repairing Brick Retaining Walls (Homogenous Unit) | |
HP03 | Support Concrete Strip Footings | |
HP04 | Supporting Concrete Footings (Single Heli Pile) | |
HP05 | Capping Heli Piles | |
HP06 | Capping Heli Piles (Using Existing Wall) | |
HP07 | Capping Heli Piles (Using Existing Wall) | |
HP08 | Capping Heli Piles (Through or Under Solid Wall) | |
HP09 | Capping Heli Piles (Through or Under Cavity Wall) | |
HP10 | Capping Heli Piles (Solid Wall Stepped Footings) | |
HP11 | Capping Heli Piles (Solid Wall on Strip Footings) | |
HP12 | Capping Heli Piles (Use Existing Wall) | |
HP13 | Capping Heli Piles (Cavity Wall onto Footings) |
Get In Touch
Unit 3, Red Shute Hill Industrial Estate
Hermitage
Thatcham
Berkshire
RG18 9QL
UK: 0845 2600 190
Overseas: +44(0)1672 812 900
Policies
- Terms & Conditions
- Privacy/Cookie Policy